Simi Industrial Hub
Simi Industrial
Concept building · Hub 01

One building, three hubsbuilt for robotics and autonomy

A 60,000 sq ft multi-tenant building where hard-tech startups build, test, charge and ship. Drag the model to look around, and pick a hub to see what happens inside.

Drag to rotate · scroll or pinch to zoom
What it's made of

A steel kit on a 50 ft grid

  • Pre-engineered steel frame. Factory-cut, bolted together on site. No interior columns across each bay.
  • Insulated metal wall and roof panels. Fast to hang, easy to cut new doors into later.
  • Thick reinforced concrete slab. Flat enough for mobile robots, strong enough for machines.
  • Movable dividing walls. Bays start at about 2,500 sq ft and combine as a startup grows.
  • Sawtooth skylights and rooftop solar with battery storage beside the building.
What it costs

Rough ballpark, before land

$7M to $12M
  • About $120 to $200 per sq ft all-in for a 60,000 sq ft building in a market like Los Angeles.
  • The steel shell is the cheap part. Power, slab and site work are where the money goes.
  • Modular keeps it down. One repeated bay, ordered as a kit, goes up in months.

These are my estimates from typical industrial building costs, not contractor quotes. Get them priced before using them with investors.

Who is inside

15 to 20 startups at once

  • Drone and unmanned aircraft teams building airframes and flying test hops.
  • Robotics companies testing arms, humanoids and warehouse robots on a real floor.
  • Autonomous vehicle and delivery-bot teams that need charging and a yard.
  • Hardware makers doing small-batch production: batteries, motors, space and defense parts.

They share the yard, loading docks, heavy power and a machine shop, and rent only the bay they need.